Hunters Farm

Location

West Sussex

Services

  • Sustainable Energy Solutions
  • Biomass Boiler
  • Mechanical & Electrical Engineering

SHARE

An idyllic farm estate set in 200 acres of woodland featuring a 6 bedroom farmhouse, separate cottage, office, gym private stables and an outdoor pool.

The requirement was to design and install a biomass boiler and district heating system to heat the main farmhouse, a stable cottage and outdoor pool.

Baystar installed a 80kW biomass boiler alongside a small district heating scheme. Baystar also modified an existing outbuilding to create a plant-room and constructed a custom-built high-specification woodchip store incorporating a chip shifter.

A project of this size has a fuel cost saving of approximately 50%.

Project Gallery

Baystar
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.